Service
Mold Remediation
Source-first remediation with proper containment, removal and verification — aligned to IICRC S520 principles.
- Cause & conditions: diagnose the moisture source and stabilise humidity/ventilation before works
- Scope & risk: assess materials and extent, define work zones/PPE, and adjust for at-risk occupants
- Containment with negative pressure: dedicated egress; pressure maintained throughout
- HEPA air filtration: continuous during works; run post-clean for particle control
- Controlled removal: cut-back of unsalvageable porous materials to clean margins
- Surface correction: clean and restore semi/non-porous substrates to IICRC standards
- Cleaning sequence: HEPA sandwich / double HEPA sandwich → HEPA vac → clean → HEPA vac
- Targeted antimicrobials: apply antimicrobial biocides/agents where indicated and compatible with materials
- Verification: pass visual/cleanliness and bring materials back to dry standard; independent clearance as/if required
- Close-out: remove containment once acceptance is met; prevention guidance